Questions?
or call us at
(714) 832-7222.
Water Projects
Reservoirs
Construction of 2.0 MG Hidden Hills Reservoir
Yorba Linda Water District selected Butier to provide construction management and inspection services for the construction of a 2.0 million gallon, dual-bay hopper, buried concrete reservoir and upgrades to the existing Santiago Booster Pump Station. The Hidden Hills Reservoir is located adjacent to a single-family residential development and undeveloped Chino Hills State Park.
Nohl Canyon Water Storage Tank Project
Butier Engineering, Inc. is a subconsultant to Tetra Tech, providing construction management, field engineering, and inspection services for this high-profile, politically-sensitive water storage tank project.
San Joaquin Hills Reservoir Conversion
Butier Engineering, Inc. provided construction management and inspection services during conversion of the existing San Joaquin Hills Reservoir from use as a domestic water reservoir to a recycled water reservoir.
Design/Build of Springdale Reservoir
Butier Engineering, Inc. provided construction management and inspection services for the design/build of the Springdale Reservoir. The project consists of a 9-million gallon cast-in-place reinforced concrete reservoir and related improvements necessary to increase the potable water storage for the City of Huntington Beach.
Overmyer Reservoir
Butier Engineering, Inc. provided construction management and inspection services for reconstruction of an existing 21.5-million gallon reservoir and booster pump station in Huntington Beach, California.
Construction of 8 Million Gallon
Lakeview Reservoir
Butier Engineering, Inc. was selected to perform construction management and inspection services for this buried, cast-in-place concrete reservoir, which is situated within a residential development in Yorba Linda, CA.





