LOCATION:
Anaheim, CAVALUE:
$806,610COMPLETION DATE:
2007OWNER:
Orange County Water DistrictCONTRACTOR:
Mike Bubalo Construction Co., Inc.Kraemer Basin 48-inch Pipeline Replacement and Miller Basin Secondary Fill Line Project
Butier Engineering, Inc. provided construction management and inspection services for the construction of the Kraemer Recharge and Miller Basin projects.
The Kraemer Basin project included the following:
- Construction of 966 LF of 48-inch CMC and epoxy lined steel pipe
- Removal and/or abandonment of portions of the existing 48-inch RCP pipeline
- Concrete encasement
- Concrete slope anchors
- Flow meter
- Corrosion test stations
- Electrical/instrumentation equipment
- Grading activities
The Miller Recharge Basin project consisted of the following:
- Construction of 200 LF of 42-inch CMC and epoxy lined steel pipe
- Concrete junction structure
- Concrete impact structure with motor operated sluice gate
- Concrete encasement
- Flow meter
- Corrosion test stations
- Removal and reconstruction of a section of the existing Carbon Creek Channel
- Electrical/instrumentation equipment
- Grading activities