Highlighted Projects
Water Projects
Wastewater Projects
Pipelines
Airports
Commercial/Public Facilities

Questions?

To discuss how we can help your organization, please contact us:
or call us at
(714) 832-7222.

Highlighted Projects

Carlsbad 50 MGD Seawater Desalination Plant

Butier Engineering, Inc. and GHD were selected to provide Owner's Engineer services for the construction of a 50 mgd seawater reverse osmosis desalination plant at the Encina Power Station. When completed, it will be the largest desalination plant in the western hemisphere.

SEE PROJECT DETAIL

Nohl Canyon Water Storage Tank Project

Butier Engineering, Inc. is a subconsultant to Tetra Tech, providing construction management, field engineering, and inspection services for this high-profile, politically-sensitive water storage tank project.

SEE PROJECT DETAIL

Prado Wetlands Reconstruction Project

Butier Engineering, Inc. provided construction management and inspection services for the reconstruction of the Prado Wetlands, a natural water quality treatment system operated by the Orange County Water District which was damaged by flood flows from the Santa Ana River in the 2004-05 storm season.

SEE PROJECT DETAIL

Expansion and Upgrade of the Henry N. Wochholz Wastewater Treatment Facility

Butier Engineering, Inc. provided construction management and inspection services for this 8-million gallon wastewater treatment facility. The expansion involved major modifications and demolition of many existing facilities.

SEE PROJECT DETAIL

Newport Trunk Sewer and Force Mains, Bitter Point Pump Station to Coast Trunk Sewer

Butier Engineering, Inc. was selected by Orange County Sanitation District to provide construction management and inspection services for the Newport Trunk Sewer and Force Mains project, consisting of the construction of two sanitary sewer force mains and a sanitary sewer gravity main.

SEE PROJECT DETAIL

Perris Valley Pipeline

Butier Engineering, Inc. has been contracted to provide construction management and inspection services for this $80 million pipeline project, which will provide water reliability and quality benefits to western Riverside County. It is a joint effort between Metropolitan Water District of Southern California (lead agency), Western Municipal Water District, and Eastern Municipal Water District.

SEE PROJECT DETAIL

Construction of Terminal C, John Wayne Airport Expansion

Butier Engineering, Inc. has joined Arcadis' team to provide quality assurance/quality control services for the Terminal Building Expansion project at John Wayne Airport. Construction of Terminal C includes the following:

SEE PROJECT DETAIL

Reconstruct Landing Surfaces of Runway 1L-19R John Wayne Airport

The Runway 1L-19R project involved milling out 3.5 inches of existing Asphalt Concrete surface layer within the runway center "keel" section area and other high traffic areas of the runway and overlay with new high durability polymer-modified asphalt concrete.

SEE PROJECT DETAIL

Advanced Water Quality Assurance Laboratory

Butier provided constructability and design review services for the new Advanced Water Quality Assurance Laboratory. Butier is currently providing construction management and inspection services for the 39,000 square-foot laboratory, which is located on OCWD's Fountain Valley campus.

SEE PROJECT DETAIL