LOCATION:

Costa Mesa, California

VALUE:

$102,309,469

COMPLETION DATE:

2012

OWNER:

County of Orange, Airport Operations/Arcadis (Prime)

CONTRACTOR:

McCarthy Building Companies, Inc.

Construction of Terminal C, John Wayne Airport Expansion

Butier Engineering, Inc. has joined Arcadis' team to provide quality assurance/quality control services for the Terminal Building Expansion project at John Wayne Airport. Construction of Terminal C includes the following:

  • A new terminal building providing six (6) additional bridged B757-200 type aircraft gates adjacent to the existing South Terminal (Terminal B). The new terminal is a multi-level steel and concrete structure comprising a total area of approximately 280,000 square feet.
  • Electrical, mechanical, plumbing systems; elevators and escalators; interior and exterior stone finishes, standing-seam metal roof panel assemblies and metal soffit panels; and certain wall and glazed assemblies.
  • Direct connections to a secured airside via a third security checkpoint (in addition to the two security checkpoints in the existing terminal).
  • New permanent facilities serving up to three (3) commuter/regional jets at the south end of the new Terminal C.
  • An atrium architectural feature in the center of the new terminal, open above baggage claim.
  • Existing terminal upgrades and refurbishments and additional concessions nodes and expanded areas along concourses.